In response to recent growth, we moved our production site from Lallio (BG), Italy, to Bergamo (BG), Italy, in January 2022, to a completely renovated and modern facility. This has not only tripled our production floorspace but allowed us to upgrade systems and processes with greater attention to sustainability and energy saving.

VEGA



-Our new heating plant recovers 65% of the heat generated by factory machinery, which is then re-used to heat the production plant departments, saving 48,000 kwh of electricity per year.

- In our offices and meeting rooms, the air-conditioning systems are independently controlled, and presence detectors only activate their operation when staff is present. In addition, the entire system is specially designed to recover air and cool it only when the outside climate allows it.

- We installed an energy-saving lighting system that automatically reduces the intensity of the light generated by LED lamps when natural, ambient light from outside is sufficient.

- We have a photovoltaic system on the roof that we forecast will provide us 60% of the energy we need and we will the remaining 40% from a supplier that produces certified energy from renewable sources: we estimate we will save the emission of 205 tons of Co2 yearly .